FPSO KNARR – BSC INSTALLATION AND STRUCTURAL INSPECTIONS

PROJECT: FPSO KNARR – BSC INSTALLATION AND STRUCTURAL INSPECTIONS

CLIENT: TEEKAY/AIBEL

 

The FPSO Knarr project included the installation of bend stiffener connectors to I-tubes as well as various inspections and verifications before moving to field.

Otech Marine Services was contracted to perform the operation and assist in developing procedures and task plans for the installation including production of platforms and tools required. An intensive inspection scope and preparations was also performed by the Otech team. Due to harsh weather conditions and water temperature both nitrox gas mix and hot water suits were used to reduce operational time.

Through a unique collaboration with Client this well executed project was completed according to their expectations and with the highest level of quality and safety.

FPSO KNARR – BSC INSTALLATION AND STRUCTURAL INSPECTIONS
FPSO KNARR – BSC INSTALLATION AND STRUCTURAL INSPECTIONS
FPSO KNARR – BSC INSTALLATION AND STRUCTURAL INSPECTIONS
FPSO KNARR – BSC INSTALLATION AND STRUCTURAL INSPECTIONS